Before bond-funded work began, Palisade High School was in good condition, but still had important facility needs. These included replacing some HVAC equipment and lighting fixtures, updating exterior windows and doors, adding fire sprinklers, and improving interior ceilings, paint, flooring, and casework. From an educational standpoint, the school needed modernized special education and small-group spaces, better lighting and acoustics in classrooms, improved science labs and casework, a safer, better-located main office, and expanded kitchen and cafeteria space to support new equipment.
Bond-funded work at Palisade High School includes major safety system improvements, with additional security enhancements planned next to support students and staff.
Completed Work Includes:
- Fire sprinkler system installed
- Fire alarm system installed
- New ceilings
- Corrections to science room gas nozzles
- Added bollards
Remaining Work Includes:
-
Permanent doors & hardware
-
Hollow metal frame corrections
-
Security vestibule addition
-
Site security walls
-
Observatory stairs
-
Auditorium fire sprinkler system